Microcement installation guide.
The tools. The action. The sequence. Hover over a step’s help label for the detailed how-to and cautions, or tap it on mobile.
Explore the steps ↓Surface preparation

Check the substrate
Tools: Inspection tools
How to approach it
- Identify the substrate and any previous coatings. Check that it is sound, firmly bonded and suitable for the planned use.
- Assess moisture, cracks, joints and changes of material using the methods required by the specification. Record concerns and obtain a repair or preparation plan before coating.
Check your work
Confirm substrate suitability and any moisture limits with the approved system.
Caution
Do not coat over active movement, loose tiles, unresolved moisture or unapproved existing coatings.

Repair, clean & mask
Tools: Repair tools · Brush · Vacuum
How to approach it
- Protect adjacent finishes, fittings and edges with suitable masking. Prepare the substrate using the method specified for that material.
- Carry out approved repairs and levelling, remove contaminants and loose material, then extract dust. Inspect corners, edges and transitions as carefully as the main area.
Check your work
The prepared surface should meet the specified profile, cleanliness and stability requirements.
Caution
Do not use a decorative coating to conceal an unresolved substrate defect or bridge a movement joint.
Primer & mesh (optional)

Optional · Substrate-dependent
Prime only where needed
Tools: Primer roller · Brush
How to approach it
- Use primer on cement, plasterboard, tiles, glass and stone surfaces. Choose the appropriate primer for that substrate.
- Do not add primer over an existing waterproofing layer or an already-primed surface. Where primer is needed, apply evenly and follow its recoat instructions.
Check your work
Confirm the exposed surface before deciding whether to prime.
Caution
Do not treat primer as a compulsory layer on every substrate.

Optional · Check board joints
Add mesh only where needed
Tools: Specified mesh installation tools
How to approach it
- Mesh is optional. Plasterboard and fibre-cement board with joint tape already applied do not need mesh.
- In a bathroom, if the fibre-cement board behind the waterproofing has taped joints, no additional mesh is needed when applying microcement over that waterproofing. For other substrates, confirm the reinforcement requirement and install as specified.
Check your work
Check whether the board joints beneath the coating or waterproofing have already been taped.
Caution
Do not add mesh automatically or treat mesh as a repair for active structural movement.
Base coat · 2 coats

Base mix ratio · 1 : 0.4
Measure & mix the base
Tools: Measuring jug · Mixer · Bucket
How to approach it
- Use clean measuring equipment and a clean bucket. Verify the selected base powder and its matching resin before preparing the mix.
- Mix to a uniform consistency using the product’s mixing method. Prepare only what you can apply within the working time.
Check your work
Confirm the components, mixing method and usable working time with the product instructions.
Caution
Do not add unapproved water or retemper material that has exceeded its working time.

Recommended · 2 thin base coats
Trowel 2 base coats — as thin as possible
Tools: Steel trowel · Spatula
How to approach it
- Spread the base with a steel trowel, keeping each coat as thin as possible. Work edges and details consistently with the main area.
- Two base coats are recommended. Allow each coat to reach the specified readiness before refining or recoating.
Check your work
Check an even profile and any specified reinforcement embedment before the finish coats.
Caution
Base is a good feathering material and can form small local slopes. It is not suitable for large-area levelling. Keep any build-up within the product’s permitted thickness.
Finish coat · 2 coats

Base sanding · 40 grit
Sand the base & vacuum
Tools: 40-grit abrasive · Sander · Matching dust extractor
How to approach it
- When the base is ready for sanding, use 40-grit abrasive to refine ridges and high points. Extract the dust thoroughly.
- For projects over 20 m², we recommend buying an orbital sander and a matching dust extractor. Use compatible extraction and follow the equipment and product instructions.
Check your work
The base should be clean and consistent before the finish coats.
Caution
Do not sand too early, expose reinforcement or leave dust behind.

Finish mix ratio · 1 : 0.6 | Recommended · 2 finish coats | Finish sanding · 120 grit
Spread, then scrape thin & smooth
Tools: Finishing trowel · Scraper / Spatula
How to approach it
- Spread material over a manageable section first. Then use a scraper or spatula to scrape the material thin and smooth.
- Two microcement finish coats are recommended. Follow the product’s recoat instructions; where sanding the finish between coats is needed, use 120-grit abrasive.
Check your work
Compare texture and colour movement with the approved sample before sealing.
Caution
Do not leave heavy build-up or expect the sealer to hide trowel defects.
Penetrating sealer

Before sealing · 120–180 grit
Lightly sand & vacuum
Tools: 120–180-grit abrasive · Dust extractor
How to approach it
- Lightly sand the finished microcement with 120–180-grit abrasive before the penetrating sealer. Use a gentle approach and avoid over-sanding.
- Vacuum away the fine dust, including edges and corners. For projects over 20 m², we recommend buying an orbital sander and a matching dust extractor.
Check your work
Check a clean, even finish and the required dryness before sealing.
Caution
Avoid over-sanding, cutting through the finish or sealing over fine dust.

Apply thinly · No ponding or runs
Apply penetrating sealer
Tools: Compatible roller · Brush
How to approach it
- Apply a thin coat of penetrating sealer. Roll in multiple directions, including diagonal passes, in a cross-hatch pattern for even spreading.
- Spread while the roller is wet with sealer. When the roller is no longer loaded, back-roll the already-spread area from another direction to even it out. Work within the product’s application window.
Check your work
Floors must have no ponding. Walls must have no downward runs that could leave tear marks.
Caution
Do not apply heavily, allow pooling on floors or let sealer run down walls. Observe the specified interval before top sealer.
Protective sealer

Apply thinly · Cross-hatch & back-roll
Thinly roll on the top sealer
Tools: Compatible roller · Brush
How to approach it
- Apply the selected top sealer thinly. Use a multi-directional cross-hatch pattern, including diagonal passes, to distribute it evenly.
- Spread while the roller is wet with sealer. When the roller is no longer loaded, back-roll the spread area from another direction. Follow the product’s mixing, coat-count and recoat instructions.
Check your work
Check for even coverage with no ponding on floors and no runs down walls.
Caution
Heavy application, floor ponding and wall runs can leave defects and tear marks. Do not back-roll after the product’s workable window has passed.

Day 2 · Light foot traffic | Day 7 · Fully cured
Light foot traffic day 2 · Full cure 7 days
Tools: Inspection light · Care checklist
How to approach it
- The system allows light foot traffic on the second day and fully cures in 7 days. Protect the surface during the curing period.
- Keep premature water exposure, heavy use and cleaning separate from light foot traffic. Follow the selected sealer’s exposure limits and supply the owner with the care instructions.
Check your work
Confirm curing conditions and any product-specific restrictions before releasing the surface for its intended use.
Caution
Light foot traffic does not mean full service. Do not treat dry-to-touch as fully cured.
Ready means more than finished.
- Inspect the surface against the approved sample and specification.
- Light foot traffic on day 2. Full system cure in 7 days.
- Observe the selected sealer’s water-exposure and service restrictions.
- Record the products used and provide compatible care instructions.
Illustrations explain the sequence and tools; they do not specify exact layer thickness.
← Back to products
