Skip to main content
← Back to products

Microcement installation guide.

The tools. The action. The sequence. Hover over a step’s help label for the detailed how-to and cautions, or tap it on mobile.

Explore the steps ↓
06 Protective sealer05 Penetrating sealer04 Finish coat × 203 Base coat × 202 Primer (optional)01 Prepared substrate
Primer and mesh are optional, depending on the substrate. Two base coats and two finish coats are recommended. Sequence diagram — not to scale.
Stage 01

Surface preparation

01
Check the substrate — illustrative tools and microcement surface

Check the substrate

Tools: Inspection tools

02
Repair, clean & mask — illustrative tools and microcement surface

Repair, clean & mask

Tools: Repair tools · Brush · Vacuum

Stage 02

Primer & mesh (optional)

03
Prime only where needed — illustrative tools and microcement surface

Optional · Substrate-dependent

Prime only where needed

Tools: Primer roller · Brush

04
Add mesh only where needed — illustrative tools and microcement surface

Optional · Check board joints

Add mesh only where needed

Tools: Specified mesh installation tools

Stage 03

Base coat · 2 coats

05
Measure & mix the base — illustrative tools and microcement surface

Base mix ratio · 1 : 0.4

Measure & mix the base

Tools: Measuring jug · Mixer · Bucket

06
Trowel 2 base coats — as thin as possible — illustrative tools and microcement surface

Recommended · 2 thin base coats

Trowel 2 base coats — as thin as possible

Tools: Steel trowel · Spatula

Stage 04

Finish coat · 2 coats

07
Sand the base & vacuum — illustrative tools and microcement surface

Base sanding · 40 grit

Sand the base & vacuum

Tools: 40-grit abrasive · Sander · Matching dust extractor

08
Spread, then scrape thin & smooth — illustrative tools and microcement surface

Finish mix ratio · 1 : 0.6 | Recommended · 2 finish coats | Finish sanding · 120 grit

Spread, then scrape thin & smooth

Tools: Finishing trowel · Scraper / Spatula

Stage 05

Penetrating sealer

09
Lightly sand & vacuum — illustrative tools and microcement surface

Before sealing · 120–180 grit

Lightly sand & vacuum

Tools: 120–180-grit abrasive · Dust extractor

10
Apply penetrating sealer — illustrative tools and microcement surface

Apply thinly · No ponding or runs

Apply penetrating sealer

Tools: Compatible roller · Brush

Stage 06

Protective sealer

11
Thinly roll on the top sealer — illustrative tools and microcement surface

Apply thinly · Cross-hatch & back-roll

Thinly roll on the top sealer

Tools: Compatible roller · Brush

12
Light foot traffic day 2 · Full cure 7 days — illustrative tools and microcement surface

Day 2 · Light foot traffic | Day 7 · Fully cured

Light foot traffic day 2 · Full cure 7 days

Tools: Inspection light · Care checklist

Ready means more than finished.

  • Inspect the surface against the approved sample and specification.
  • Light foot traffic on day 2. Full system cure in 7 days.
  • Observe the selected sealer’s water-exposure and service restrictions.
  • Record the products used and provide compatible care instructions.

Illustrations explain the sequence and tools; they do not specify exact layer thickness.

← Back to products
Microcement Installation Guide | SurfaceLab